Overview
Produce a comprehensive 30-day stability report for the RAXION testnet.
Report Sections
Executive Summary
- Total uptime percentage
- Key achievements
- Issues encountered
- Lessons learned
Network Statistics (Day 1-30)
| Metric |
Value |
| Total Inferences |
TBD |
| Avg Coherence Score |
TBD |
| Total Challenges |
TBD |
| Challenge Rate |
TBD |
| Total Slashes |
TBD |
| Slash Amount (RAX) |
TBD |
| Active Agents |
TBD |
| Uptime |
TBD |
Reliability Metrics
Incident Report
Document any incidents during the period:
| Incident |
Severity |
Duration |
Resolution |
| (to be filled) |
|
|
|
Economic Health
Community Growth
PoIQ Protocol Performance
Acceptance Criteria
- Report drafted and reviewed
- All metrics populated from on-chain data
- Incidents documented with root cause analysis
- Recommendations for M5 (60-day checkpoint)
Part of M4: 30-Day Stability Checkpoint
Overview
Produce a comprehensive 30-day stability report for the RAXION testnet.
Report Sections
Executive Summary
Network Statistics (Day 1-30)
Reliability Metrics
Incident Report
Document any incidents during the period:
Economic Health
Community Growth
PoIQ Protocol Performance
Acceptance Criteria
Part of M4: 30-Day Stability Checkpoint